My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-14_REVISION - M1992069 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992069
>
2003-10-14_REVISION - M1992069 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:49 PM
Creation date
11/21/2007 3:18:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Design Report
From
Applegate
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, <br />~; <br />) <br />I~ <br />North Eaaleview Droinaae Desion ReooM <br />SUMMARY #3 AND "F" ST CONCRETE BOX CULVERTS <br />Pages 1 thrv 6 of the CBC summary worksheets contain results of modeling the #3 Ditch flows in o seporote SWhAM <br />model ("gevD#3.xp°) and then comparing that model results to the results calculated for the project SWMM model <br />°gev3-IOO.xp". The summary pages also list the hydrogrophs of flow in the #3 Ditch at cross section #177 just <br />upstream of the project model. These hydrogrophs are input to the project model to simulate flows in the #3. <br />Pages 5 and 6 contain dimension and elevation information for the #3 CBC and The F St CBC as well as for the two <br />drop structures to be constructed in the main channel and the #3 weir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.