My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36843
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:02 PM
Creation date
11/21/2007 3:16:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/14/1992
Doc Name
BATTLE MTN RESOURCES SAN LUIS PROJECT PN M-88-112
From
PARCEL MAURO HULTIN & SPAANSTRA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br />to pay any bonus, damage or other claim asserted by Consultant for its <br />the uncompleted portion of the Work. <br />8.3 Either DMG, BMRI or both parties together may at any <br />notice to Consultant, require Consultant to stop all or any part of the Work <br />up to ninety (90) days after the notice is delivered to Consultant (the "Stop <br />Upon receipt of the Stop Work Order, Consultant shall comply immediately <br />and take all reasonable steps to minimize the incurrence of costs allocabl <br />covered by the Stop Work Order during the period of work stoppage. Wit: <br />ninety (90) days after a Stop Work Order is delivered to Consultant, or withii <br />of that period to which the parties have agreed, BMRI, after consulting wi <br />either cancel the Stop Work Order or terminate the Work covered by the Stt <br />as provided above. Consultant shall resume Work upon cancellation or ex <br />Stop Work Order. Equitable adjustments shall be made in the delivery sch <br />hereunder, or both, and this Agreement shall be modified in writing accordir <br />Work Order results in an increase in the time required for the performance <br />in Consultant's costs properly allocable thereto. <br />Article 9 -Limit of EngaEement <br />-19- <br />profit on <br />ne by written <br />'or a period of <br />Nork Order"). <br />with its terms <br />to the Work <br />in a period of <br />any extension <br />t DMG, shall <br />r Work Order <br />ation of any <br />ule or prices <br />y, if the Stop <br />the Work or <br />.~ fir ~.~ .. ~ay <br />
The URL can be used to link to this page
Your browser does not support the video tag.