My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-12-20_ENFORCEMENT - C1996083
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1996083
>
2000-12-20_ENFORCEMENT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2021 2:17:19 PM
Creation date
11/21/2007 3:15:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
12/20/2000
Doc Name
NOV NO CV-2000-014 BOWIE 2 MINE PN C-96-083
From
DMG
To
BOWIE RESOURCES LIMITED
Violation No.
CV2000014
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~- <br />IMPORTANT: Please read carefully. <br />~iration Date of Notice -Informal Hearine at Site. If this notice requires cessation of mining, <br />expressly or in practical effect (but not otherwise), it will expire automatically 30 days after setvice <br />upon you, unless, within that time, (a) an informal hearing on the cessation has been held at or near <br />the site, or (b) the operator has waived the holding of such a heazing. The hearing will be presided <br />over by representatives of the Division other than the representative who issued the order. Temporary <br />relief from the order may not be requested at such hearing. Your right to a formal review is not <br />affected by any waiver on your part of an informal hearing. <br />2. Formal Review and Temporary Relief. The operator has the legal right to a review of this notice of <br />violation in a public hearing before the Colorado Mined Land Reclamation Board. You may apply <br />for review by submitting a request for review within 90 days of the issuance of this order. The request <br />for review must be submitted to: Colorado Mined Land Reclamation Board, 1313 Sherman Street, <br />Room 215, Denver, Colorado 80203. <br />If you request a formal hearing, you may request temporary relief from this notice of violation, <br />pending hearing, but the filing of a request for review does not operate as a stay of any order or notice. <br />Procedures in this regard are found in C.R.S. 1973, 34-33-124. <br />3. Penalties. If you fail to correct any of the violations described in this notice within the period <br />permitted for its correcting, a minimum penalty of $750.00 or more must be assessed for each day <br />during which the violation(s) continues beyond the abatement period set forth in this notice. <br />If you willfully and knowingly fail or refuse to comply with a condition of a permit, you will be <br />subject to criminal prosecution and will, upon conviction, be punished by a fine of not more than <br />$10,000.00 or by imprisonment for not more than one year, or both. <br />In accordance with Section 5.04.3(1) of the Rules and Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, within IS days of service of a notice of violation or <br />cessation order, you may submit written information about the violation to the Division. The <br />Division shall consider any information so submitted in determining the facts surrounding the <br />violation and the amount of civil penalty to be proposed under Section 5.04.3(2). <br />4. Effect on Permit. In addition, if it is determined that a pattern of violations exists and that the <br />violations were caused by unwarranted failure to comply, or were willful, your permit my be <br />suspended or revoked. <br />0221F(3/97) <br />
The URL can be used to link to this page
Your browser does not support the video tag.