My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36743
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:59 PM
Creation date
11/21/2007 3:13:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
7/22/1994
Doc Name
PERMIT C-81-019 COLOWYO COAL CO LP NOV C-94-013
From
COLOWYO COAL CO LP
To
DMG
Violation No.
CV1994013
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;. <br /> <br /> <br />COAL ~~i <br />COMPANY L.P. ~ <br />July 20, 1994 <br />Mr. Anthony J. Waldron <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Permit C-61-019 <br />Colowyo Coal Company L.P <br />NOV C-94-013 <br />Dear Mr. Waldron: <br />~ iii ii ~iiiiii <br />5731 State Highway 13 <br />Meeker. Colorado 81641 <br />1303182a-aa51 <br />n,... <br />~~ '•,, <br />~U( 22 1994 <br />n,t,.V.,L, C. <br />,.ru. <br />„ ~..~ <br />,,, j <br />The purpose of this letter is to provide the Division with <br />additional information regarding the referenced NOV and to provide <br />a response to the Division's "Civil Penalty Worksheet" dated June <br />16, 1994. <br />• The initial inspection report of May 27, 1994 noted that <br />the subject ditch was to be constructed prior to the end <br />of the inspection. A casual reading of the report would <br />leave the false impression that the lack of sediment <br />control was a complete oversight by Colowyo and <br />absolutely no effort had been initiated to correct the <br />situation. Prior to the DMG inspection this oversight <br />had, in fact, been recognized by Colowyo, and a dozer had <br />been mobilized to the site and operators were on the <br />ground beginning the initial survey for the ditch. A <br />plan was clearly in place to correct our oversight <br />independent of the DMG inspection. <br />• Ditch construction was rapidly completed within 24 hours <br />of the Division's observations. The ditch construction <br />was completed extraordinarily fast because Colowyo had <br />recognized the oversight well before being noticed by the <br />Division and had already mobilized equipment to the area. <br />Colowyo's rapid response was instrumental in preventing <br />any potential offsite environmental harm. <br />• The NOV states that there was a "failure to pass <br />disturbed drainage through a sedimentation pond or <br />treatment facility before leaving the permit area". <br />Since there was no storm event or other source of runoff <br />occurring prior to construction of the ditch, this <br />statement is incorrect. There. was, in fact, no <br />disturbance drainage therefore no resultant environmental <br />damage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.