My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-06_REVISION - C1981025
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981025
>
2001-02-06_REVISION - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2021 6:56:01 AM
Creation date
11/21/2007 3:12:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
2/6/2001
Doc Name
Midterm Review Findings Document
From
DMG
To
MINREC, Inc.
Type & Sequence
MT4
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> This document presents the results of the Division of Minerals and Geology's Midterm Review <br /> for the North Thompson Creek Mines permit. This Midterm Review was conducted to fulfill the <br /> requirements of Rules 2.08.3, 2.06.2(10), 2.06.3(4), 2.06.5(2), 2.06.7(5) and 3.02(4). <br /> Rule 2.08.3 requires that the Division of Minerals and Geology (Division) conduct a review of <br /> each permit issued, prior to its midterm. Based on this review, for good cause shown, the <br /> Division may require reasonable revisions or modifications of the permit provisions to ensure <br /> compliance with the Act and Regulation (Rule). Fifteen items have been identified for revision <br /> or modification to the Permit Application Package. <br /> Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices, mountaintop removal <br /> variances, variances from approximate original contour (AOC), and variances from <br /> contemporaneous reclamation, respectively, be reviewed by the Division where applicable <br /> during the Midterm Review. <br /> Rule 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br /> acceptance of the bond every 2 '/2 years. <br /> This Midterm Review consists of a review of the North Thompson Creek Mines permit <br /> application and Findings Document to identify items that may have been overlooked during the <br /> initial review. The Division also reviewed all subsequent revisions and stipulation responses to <br /> ensure that all permit commitments and conditions were being followed. Problems and <br /> observations from past inspection reports were also considered. <br /> Appendix A is a list of acronyms used in this review. <br /> Appendix B is a list of sources of information, keyed to superscripts in this review. <br /> SECTION I - HISTORY <br /> On August 15, 1983, the Snowmass Coal Company was issued a permanent program Mining <br /> Permit - Coal, Permit No. C-025-81 t, for the North Thompson Creek Mines. Features and <br /> elements of the existing mine that were to be used during subsequent operations and reclamation <br /> were incorporated into the permit. The Permit was subsequently renumbered to Permit No. C-81- <br /> 025. This permit was for a five-year term. The Division renewed this permit for a subsequent <br /> five-year term on August 16, 198 82. The 1988 permit was transferred to MINREC, Inc. <br /> (permittee), in 1990. The Division again renewed the permit for five-year terms on August 15, <br /> 19934, and August 15, 19985. This most recent five-year-term Permit, hereafter referred to as the <br /> permit, expires on August 15, 2003. The date this Midterm Review is due is February 11, 2001. <br /> The North Thompson Creek Mines are inactive. They were mined from 1911 to 19646. The <br /> Snowmass Coal Company mined the site from 1971 to 19846. Mining ceased, and reclamation of <br /> the site was initiated, in 19867. <br /> North Thompson Creek Mines -3- 6 Feb 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.