My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-06_REVISION - M1992054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992054
>
2006-02-06_REVISION - M1992054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:07 PM
Creation date
11/21/2007 3:12:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992054
IBM Index Class Name
Revision
Doc Date
2/6/2006
Doc Name
Cost Summary Form
From
DMG rco
To
LBCR LLC
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRGPFR _ (]NI V WC]RK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 006 State :Colorado <br />Date : 01/24/2006 County : La Plata <br />User : RCO Site :Ignacio Pit <br />Permit or otherjob action :Conversion CN-1 <br />Task description :Carry topsoil to farther graded areas <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cosUhour : $64.24 NA Weight (UST) : 56.34 <br />Operating cost/hour: $108.80 100 Cosf data source : (CRG) <br />Operator cost hour : $32.15 NA <br />Total unit cosUhour : $205.19 Total fleet cosUhour : $205.19 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,411 LCY factor : NA volume : 9,411 LCY <br />Source of quantity take-off : f 0 ac x 7 in avg depth <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Haulinc CaoaciN <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 <br />Material description <br />Earth - Drv Hacked <br />Rated payload ; 82,000 pounds <br />Payload capacity : 32.16 LCY <br />Cvcle Time (load + haul + spread + return) <br />Travel time <br />Stmck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.60 LCY "' <br />Loading time : 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />tootling lime per pair on push-pull rtwtlels <br />Route Distance (feet) Grade (°/) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 500 4.0 5.0 9.0 757 0.70 minutes" <br />Return : 500 -4.0 5.0 1.0 3,026 0.17 minutes "` <br />"travel time adjusted far acceleration and deceleration al load and dump points <br />velocities are r*ax. attainable per total resistance shown, not average <br />Job Condition Correction Factors <br />Site altitude (feet) : 6,240 <br />Altitude adjustment factor : 0.96 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiWday) <br />Net job correction factor : 0.80 <br />Total cycle time 2.47 minutes <br />Adiusted Hourlv Production <br />Unadjusted unit production : 695.41 LCY/Hour"' <br />Adjusted unit production : 554.10 LCY/Hour <br />Adjusted fleet production : 554.10 LCY/Hour <br />'- 2 times volume on push-put l models <br />PermiUjob # : M-1992-054 <br />Abbreviation :none <br />Filename :M054-006 <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 18.98 Hours <br />Unit cost : $0.370 /LCV Total job cost : $3,485 <br />
The URL can be used to link to this page
Your browser does not support the video tag.