My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-06_REVISION - M1992054
>
Day Forward
>
Revision
>
Minerals
>
M1992054
>
2006-02-06_REVISION - M1992054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:07 PM
Creation date
11/21/2007 3:12:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992054
IBM Index Class Name
Revision
Doc Date
2/6/2006
Doc Name
Cost Summary Form
From
DMG rco
To
LBCR LLC
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 01/24/2006 <br />User : RCO <br />Permit/job# : M-1992-054 <br />County :La Plata Abbreviation :none <br />Site :Ignacio Pit Filename :M054-002 <br />Agency or organization name :DMG <br />Permit or other job action :Conversion CN-1 <br />Task description :Push overburden over <br />HOURLY EQUIPMENT COST <br />areas <br />Basic machine :Cat DSR Series ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhcur : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $146.70 Total fleet cosUhour : $146.70 <br /> <br />MATERIAL QUANTITIES ~ ~~ <br />Initial Swell Loose <br />volume : 24,200 LCY factor : NA volume : 24,200 LCY <br /> <br />Source of estimated volume :10 ac x 1.5 h depth <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 % (r <br />Average site altitude : 6,240__ feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.563 /LCY <br />State :Colorado <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 1.11 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.53 <br />Adjusted unit production : 260.77 <br />Adjusted fleet production : 260.77 <br />Total job time : 92.80 <br />Total job cost : $13,614 <br />LCY/hr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.