Laserfiche WebLink
below the windrow until it was replaced on the pile by the <br />operator as soon as conditions would allow in the spring. I <br />conclude this represents a low amount of seriousness and $250.00 <br />is proposed. <br />Fault <br />The operator was attempting to salvage all topsoil in the amount <br />of time given after their PR was approved. (Hydrological <br />modelling issues delayed the decision.) It was not as much time <br />as they had anticipated, and the adverse conditions prevented <br />them from completing the piles to their final configuration. <br />$250.00 is proposed which represents a low degree of fault. <br />Good Faith <br />Colowyo rented equipment to correct the problems at this site <br />after their own equipment broke down. It was a very wet spring. <br />They worked on the area as soon as conditions would allow and <br />completed the abatement in the shortest time possible. I <br />conclude that their efforts represent an extraordinary effort and <br />that the NOV was abated in the shortest time possible. I <br />recommend a $250.00 reduction for good faith. <br />Settlement Agreement Penalty Proposed. $250.00 <br />