My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36669
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:56 PM
Creation date
11/21/2007 3:10:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Enforcement
Doc Name
NOTICE OF VIOLATION
Violation No.
CV1993007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- r~r <br /> <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />III IIIIIIIIIIIIIIII <br />ass <br />NOTICE OF VIOLATION NOV No. L-93-007 <br />Permit No.: C" ~~" 022 <br />Type of Mine: UG ~e~wH) <br />Operator (If Other than Permittee): <br />same <br />Mail Address: Cu,n„V <br />Inspector: ~jo,,;~~ $c~ry <br />Mine: ,$ erse~ ; ; <br />County: ~e (~.~ G.iv~His <br />Permittee: S,nv~evSe~ IM~^~y'c (D, <br />Mail Address: P.O, ~f~x 53S" <br />S~,e.-u~~ (1~ 8~y3y <br />Date/Time of Inspection: <br />2~Z3~93 2 ~ y S p.~+. <br />Served By: <br />re o norizea representative <br />d an eclamation Division) <br />Date and Time of Service: <br />A.M. <br />CERTIFIED MAIL N0. ~~~ 1.1i`~1a3 , Jz.uy -F~M~~ <br />Return Receipt Reque~ed <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not ~C expressly, or in <br />practical effect, required by this notice. For this purpose,x`~mi-ring" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />X5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.