Laserfiche WebLink
au~-io-ai wr.u ii~iu nn rw~iwt5i t~K Hint FAH NU. 9709295595 P, 03/03 <br />. - v' <br /> <br />Evaluate inclinometer and survey data, recalculate <br />stability and strength parameters, redesign road <br />section. <br />Notes: <br />Inclinometer and surface survey data will be collected daily (if possible) throu~,,h 7/25!97 and then <br />weekly thereafter. Piezometers may also be installed depending oa drill logs of inclinometer <br />holes. During inclinometer hole drilling, Shelby tube samples will be collected at probable failure <br />surfaces for visual examination. <br />Please contact Eric Mende or me should you have questions. <br />Data collection will be relatively <br />continuous for the next few <br />months. No attempt to rebuild the <br />failed section of road will be made <br />until evaluations and redesign are <br />completed, and submitted to <br />CDMG. Approximate schedule is <br />October 1997 for submittal to <br />Sincerely, <br />:, '~ <br />Kathleen G. Welt, <br />Envirorunental Supervisor <br />u: David Berry, CDMG <br />Mike Boulay, CDMG <br />Chris Nyikos <br />Eric Mende <br />Phil Schruidt <br /> <br />