My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36644
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:55 PM
Creation date
11/21/2007 3:10:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
10/1/1992
Doc Name
MINESITE INSPECTION NARRATIVE
Violation No.
TD1992020244002TV2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"1I~ESITE I~'SPF_CTI~S N4RR9TIVE 4 <br />e~:pla.'u > what the symbols represent and hoe: the shots were modified from <br />the typical mine plan data. <br />CF~ERaL CO'IMG\TS <br />The mine is opening a new mining. aria dust adjacent to the a~rico <br />operation in Sections 1± and lG. The,: wart'=d strip?ping lnpsoil. in .1~01~: <br />and plan to be done by by the end of ne5a week. The warar manygement <br />scstem for ciisrl.lrbed area Cloves. off of the mite have been eOnlplet?d. II? <br />additio.^. to th? n'='r di~'ersions noted in th? TD\', thee ha~.e also Lnilt a <br />ne4: sedi!Be!IC pOlld ]. Il Pi OSpe,'t GU1C11 wh1C11 '':as completed h\' tltP B^(1 of <br />,L!lc. r.s the rile=oil is being pulled and stored, they haca began <br />preparation work Yo: tho ealley fill in section 1~. T1:e 24 foot 4:ide <br />core tranch for the n;ck drain in the too million yard val.le~ fill ~+as <br />hel!1^ Ope'1ad III? dS 'ne 4:a trl~c~ri f r3H:'L`. I"~~111`~ th~> li•1's 011. Tnn5nil <br />from most of the area is tieing. stored in piles, if-.v, E ar.d C. In area=_ <br />arnund the p?rim?Cer, they 1?aae a1s:~ ••timlrnwed smaller portions "f Ih'. <br />soil for storage around tha oerimeter. Ihere was some cor.ce~n i'v sta[~ <br />parson:^."1 •liwnt th'= dotal icm of the storaee and the detail proridad in <br />the mine Flan approval for the piles. Tha colmnent was maci? that thi=. <br />mad' need ro he pursued further ~. claritl how long the windrows were to <br />r?main and ho4; then- were to '.e many^ed. <br />Drillers were pr?Haring the firsT area in the n?s area f.or an os?rburrte^ <br />shot. <br />Coal from the .. seam in Section 1] area r:ili be remove,l by t]:~e _ .. '~: <br />[be year. <br />Sew mining equipment has been purchased for [Ite new expansion. Th? mine <br />is a multiple seam 'noticut that requires coordination betaeeu their <br />truck-shovel operation and a dragline in the current mining area. In <br />order to speed up the coal recovery, the}• have purchased an additzon.jl <br />GO hard (lragline for the nave pit. It is being reconditioned and elected <br />on the site. <br />Coal from the mine is stored in two cliff?rent stockpiles, one near Lhe <br />top of the mine and the other at their loadout which is a part of the <br />permit area. <br />Fuel storage on the mine has been redone to meet EPi standards for spi71 <br />prevention and containment. <br />ell r_ulverts on tl:? mine were checked for maintenance. a1 numbar of ;Il,:. ,i <br />pare noted that required some work before winter set in. In my notes <br />the following comments were made; 1. "K" needs cleaning nn the upper <br />end, 2. "I", bottom end was half full, 3. "0" outlet has to be redone. <br />%. south of Rairoad underpass culvert needs cleaning. <br />"linor erosion off of the shop pad and change room outlet to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.