My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-20_REVISION - M1981277
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981277
>
2005-01-20_REVISION - M1981277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:31 PM
Creation date
11/21/2007 3:08:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981277
IBM Index Class Name
Revision
Doc Date
1/20/2005
Doc Name
Incompl. 112 Amend. Pkg.
From
DMG
To
Loukonen Brothers Stone
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />(b) A comparison of the proposed post-mining land use to other land uses in the vicinity and to <br />adopted state and local land use plans and programs. In those instances where the post-mining land use is for <br />industrial, residential, or commercial purposes and such use is not reasonably assured, a plan for revegetation <br />shall be submitted. Appropriate evidence supporting such reasonable assurance shall be submitted; <br />(c) A description of how the Reclamation Plan will be implemented to meet each applicable <br />requrremem of Section 3. l; <br />(d) Where applicable, plans for topsoil segregation, preservation, and replacement; for <br />stabilization, compaction, and grading of spoil; and for revegetation. The revegetation plan shall contain a list <br />of the preferred species of grass, legumes, forbs, shrubs or trees to be planted, the method and rates of seeding <br />and planting, the estimated availability of viable seeds in sufficiem quantities of the species proposed to be used, <br />and the proposed time of seeding and planting; <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of different <br />stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various t ges or <br />phases of reclamation; <br />and. <br />out. <br />(ii) A description of the size and location of each azea to be reclaimed during each phase; <br />(iri) An outline of the sequence in which each stage or phase of reclamation will be carried <br />(The schedule need not be separate and distinct from the Reclamation Plan, but maybe incorporated therein J <br />(f) A description of each of the following: <br />(i)--Final-grading -speeify maxarrurrranticipated-slopE-gradiem or~expected~arrges thereof; <br />planting; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding and <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revege[ation -specify types of trees, shrubs, etc., quantities, size and location; and <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those azeas <br />where topsoil will be replaced. <br />F,XFiiRTT F _ Rerlamafinn PIAn Mnn ~lRulr F a.Fl~ The map(s) of the proposed affected land, by all phases <br />of the total scope of the minim operation, shall indicate the following: <br />(a) the expected physical appearance of the azea of the affected land, correlated to the proposed mining <br />and reclamation timetables. The map must show proposed topography of the azea with contour <br />lines of sufficiem detail to portray the direction and rate of slope of all reclaimed lands; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.