Laserfiche WebLink
intentional but should have been avoidable. A review of the soils <br />and slope should have caused the operator to take a closer look at <br />the results of unloading the slope toe as a result of construction <br />of the blade line. <br />Also, the good faith credit of $50.00 was maintained due to the <br />rapid submittal of a minor revision and bond adjustment. This good <br />faith credit offsets the $50.00 penalty for having one NOV during <br />the past 12 months. Therefore the total civil penalty due from the <br />operator for this Notice of Violation Number C-93-057 was set at <br />$500.00. <br />