Laserfiche WebLink
_- <br /> <br />(SC4EOULE i0 '+OiICE OF viCLaTION) <br />Vocice of violation Vo. NOV - ______81_38_ <br />`Ip T~J P.E nF YIOL~Ti7N <br />Failure to certify the existing refuse pile during critical construction periods. <br />at>' DR PERMIT PROVISI~7~:(S) VIJLaiEO <br />~PlA SECiION(S)_715_15(a~_of the Federal Interim Prog_am____~___ <br />PFRNIT SECTI7N S Volume 1, page 58 <br />PpRiION OF TAE OPERaTION T7 :!HIGH Tr+IS NOi[CE aPPLI"e5 <br />The refuse pile at the mine site. ______ <br /> <br />STEPS NECESSaity r0 agaTE VIOLaTION (REMEOIaI aCi[ON) <br />Submit a report which certifies the refuse pile is structurally stable and was <br />built according to the approved plan. <br />TI'"E FOR a9aTEMENt (NOT MORE THaN 90 DavS)~ <br />ON OR 9EFJRE _September 30__~ Iq 81 <br />CNR/La0005/90S <br />