My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36463
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:48 PM
Creation date
11/21/2007 3:05:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
11/22/2006
Doc Name
Memo -Request for Extension of Abatement Deadline Beyond 90-Days
From
Dan Hernandez
To
Ronald Cattany
Violation No.
CV2006006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 275 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Date: November 22, 2006 Bill Owens <br />Gavemar <br />To: Ronald W. Cattany, Director Russell George <br />Executive Director <br />From: Daniel I. Hernandez ~ ~ ~-~' Ronald W. Cattany <br />Division Director <br />SenlOr E11V1rOrlTrlental PI'OteettOn SpeClallSt Natural Resource Trustee <br />RE: Request for Extension of Abatement Deadlines Beyond 90-Days <br />Twentymile Coal Company, The Foidel Creek Mine <br />Permit No. C-1982-056, Notice of Violation No. CV-2006-006 <br />The Coal Program issued Notice of Violation No. CV-2006-006 to Twentymile Coal Company on <br />September 19, 2006. This NOV was issued for a spill of coal processing fines from the Foidel Creek <br />Mine into Foidel Creek and the mine's Sedimentation Pond E. <br />The NOV has three remaining abatement steps: Steps 9b, 10, and 11. Twentymile Coal Company has <br />requested extensions of the deadlines of these steps (letter attached). The new deadlines would be at <br />dates beyond 90 days from the September 19, 2006 NOV issuance date. <br />The deadline for NOV Abatement Step 9b, which requires the permittee to "remove coal fines <br />accumulation from north pond area and dispose of coal fines in existing coal refuse area", would be <br />extended from December 4, 2006 to January 31, 2007, so as to allow the coal fines to freeze and to <br />thereby improve their handling ability. <br />The deadline for NOV Abatement Step 10, which requires the permittee to "submit as-built (as-repaired) <br />construction drawings for the cleaned Sedimentation Pond E, with a demonstration of adequacy for <br />treatment of surface inflows (process flows and surface)", would be extended from December 11, 2006 <br />to February 9, 2007. <br />The deadline for NOV Abatement Step 11, which requires the permittee to "report, in writing, <br />completion of the Foidel Creek clean-up to the Division, CDPHE-WQCD, CDOW, and USAGE", <br />would be extended from December 11, 2006 to Februazy 9, 2007. <br />The Coal Program finds that the Twentymile Coal Company request complies with the requirements of <br />Rule 5.03.2(2)(c)(iii) of the Regulations of the Colorado Mined Land Reclamation Board for Coal <br />Mining (9/14/2005) regarding extensions of abatement deadlines for periods greater than 90 days from <br />the date of the issuance of a Notice of Violation. The Coal Program supports the permittee's request, <br />and requests your signature of the attached "Extension of Time for Abatement Notice" Form. <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />