Laserfiche WebLink
MRY 19 '95 08:43RM PERHODY WSTN SENECR MINE <br />• <br />P.2 <br />~ III IIIIIIIIIIIIIIII <br />Seneca Coal Co <br />May 18, 1995 <br />Mr. Wallace Erickson <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />R8: Seneca II-W, Permit C-8$•057, NOV No. C•95-007 <br />Dear Mr. Erickson: <br />This correspondence is a request for another extension of time for <br />the field abatement of NOV No. C•95-007. The abatement work was to <br />consist of cleaning out and properly disposing of haul road <br />sediment deposition at the following two culvert locations: ME-5 <br />and G•2. An extension had been granted for both sites to abate the <br />NOV by Friday, May 19th. Due to the excessive amount of <br />precipitation the mine has still been receiving, this work has not <br />yet been able to be completed. Z dm asking for another two week <br />extension, or a deadline of June 2nd. Hopefully, ground conditions <br />will dry out enough to finish the work that was originally started. <br />Please contact me if you or any other members of the Division have <br />any questions concerning this request. <br />Sincerely, <br />~~.P,~. ~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary wendt(PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81839 <br />781ephone (303) 276.9707 • FAX (303) 278-3014 <br />