Laserfiche WebLink
Gregg R. Squire <br /> May 14, 1997 <br /> Page 2 <br /> ponds/lakes are identified by numbers 1-5 with#1 located at the north end of the Deepe Pit and <br /> #5 at the south end of the pit, where the settling basins are located. <br /> The Amended Reclamation Plan calls for reducing the amount of exposed water surface by <br /> 33.9 acres as follows: <br /> Pond #1 -There is no change proposed for this existing 2.3 acre pond, which is located at the <br /> north end of the Deepe Pit in Stage No. 1. <br /> Pond#2 -This existing pond is located approximately 1000 feet south and slightly west of <br /> Pond #1. The Amendment reduces this pond from 6.9 acres to its current size of 1.9 acres. <br /> Pond #3 -This 15.5 acre pond was to be located east-southeast of Pond#2 in Stage No. 5. <br /> The Amended Reclamation Plan calls for the elimination of this pond. Currently the area <br /> that Pond #3 was to occupy has, for the most part, already been graded, topsoiled, and <br /> seeded. <br /> Pond #4 - Located in Stage No. 6 west of the former processing plant and stockpile area, this <br /> 7.1 acre pond will not be constructed under the Amended Reclamation Plan. This 7.1 acre <br /> area will require backfilling, grading, topsoil, and seeding. <br /> Pond #5 -This 6.5 acre pond was to be constructed at the north end of Stage No. 4. The <br /> Amended Plan calls for the elimination of this pond; however, because Stage No. 4 was <br /> used for the disposal of wash fines, no topsoil will be needed to reclaim the area of Pond <br /> #5. The area will be reclaimed in a manner similar to the "Marshall Pit," which is located <br /> immediately south of Stage No. 4. <br /> Based on current reclamation conditions at the Deepe Farm Pit, the Amended Reclamation <br /> Plan will require approximately 7 acres of previously planned water surface to be topsoiled and <br /> seeded. <br /> The total area of disturbance which has not yet been topsoiled includes the following areas: <br /> • The former processing plant area,estimated to be 26 acres. <br /> • Approximately 40 acres of Stage No. 6. This includes 7.1 acres associated with Pond <br /> #4 <br /> Therefore, the estimated total area remaining to be topsoiled is approximately 66 acres. <br /> The amount of stockpiled material available for use as topsoil is approximately 50,000 <br /> cubic yards, or 5.63 inches of topsoil over the 66 acres described above. <br /> Regarding topsoil depths for reclamation, it is Western Mobile's understanding that the <br /> construction materials rules do not require topsoil to be imported to a site if it was not present <br /> originally. Enclosed with this letter is a blue line copy of the original "Excavation Plan Map" <br />