My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-17_REVISION - M1986159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986159
>
2002-04-17_REVISION - M1986159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:28 PM
Creation date
11/21/2007 3:01:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
Revision
Doc Date
4/17/2002
Doc Name
Receipt of Permit Amendment Package
From
DMG
To
Lafarge West Inc.
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 5 - <br />Resuonsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, <br />there are a number of important requiiements which you, as a permittee, should fully understand. These <br />requirements ate listed below. Please read and initial each requirement, in the space provided, to acknowledge <br />that you understand your obligations. If you do not understand these obligations then please contact this Office <br />for a full explanation. <br />~~~5 1. .Your obligation to reclaim the site is not limited to the amount of the fmancial warranty. You assume <br />legal liability for all reasonable expenses which the Boazd or the Office may incur to reclaim the affected <br />lands associated with your mining operation in the event your permit is revoked and financial warranty is <br />forfeited; <br />175 2. The Board may suspend or revoke this permit, or assess a civIl penalty, upon a fmding that the <br />permittee violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that <br />information contained in the application or your permit misrepresent important material facts; <br />~NS 3. If your mining and reclamation operations affect azeas beyond the boundazies of an approved permit <br />boundary, substantial civil penalties, to you as permittee can result; <br />~s 4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />~~n -5 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />~-S 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the <br />entrance of the mine site, whichshall be cleazly visible from the access road, with the following information <br />(Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado <br />Mined Land Reclamation Board; and, <br />c. the permit number. <br />_. 7. The boundaries of the permit boundary area must be marked by monuments or other markers that are <br />clearly visible and adequate to delineate such boundaries prior to site disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.