Laserfiche WebLink
The irrigated fields should be deemed successful when they produce at least 90% of the crop by <br />weight of the pre-mine conditions. <br />The revegetated area will be monitored for success of reclamation until accepted by the Division. If <br />revegetation failures occur prior to release, an analysis of the site will be made and the area will be <br />revegetated again as necessary. <br />7. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the Shavano NRCS office to assist in determining the ability <br />of the reclaimed land to control erosion. If minor changes or modifications are needed to the seeding <br />and reclamation plan, revision plans will be submitted to the Division as required. It is hoped that the <br />Division will provide assistance in evaluating the success of the ongoing reclamation process. Al] <br />areas disturbed and reclaimed and any other important items regarding the reclamation will be <br />submitted in the annual reports to the Division. <br />Haldorson Sand and Grave] Mine 25 <br />