My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-19_REVISION - M2003037 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003037
>
2004-08-19_REVISION - M2003037 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:28 PM
Creation date
11/21/2007 3:00:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
Revision
Doc Date
8/19/2004
Doc Name
112c Amend Appl
From
Haldorson and Sons Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table E-2: Reclamation Timetable <br />Stage A <br />Task # escri tion ime needed ears <br />1 Stri to soil from Phase Al 0.02 <br />2 Stri to soil from Phase A2, and mine Phase Al .75 <br />3 Stri to soil from Phase A3, mine Phase A2, and reclaim Phase Al .67 <br />4 Stri to soil from Phase A4, mine Phase A3, and reclaim Phase A2 5.02 <br />5 Stri to soil from Phase 5, mine Phase A4, and reclaim Phase A3 5.40 <br />Total 19.84 <br />Stage B <br />Task # escription ime needed <br />ears <br />1 Stri to soil from Phase B1, Remove houses from Phase B1 0.02 <br />2 Stri to soil from Phase B2, and mine Phase B 1 .78 <br />3 Stri to soil from Phase B3, mine Phase BZ, and reclaim Phase B 1 .71 <br />4 Stri to soil from Phase B4, mine Phase B3, and reclaim Phase B2. 5.04 <br />5 ine Phase B4, and reclaim Phase B3, Remove houses from Phase 5 5.36 <br />Total 19.89 <br />Stage C <br />Task # escription ime needed <br />ears <br />1 Strip topsoil from Phase 6, mine Phase 5, reclaim Phases A4 and <br />4 1,39 <br />2 Stri to soil from Phase 7, mine Phase 6, reclaim Phase 5 1.79 <br />3 Stri to soil from Phase 8, mine Phase 7, reclaim Phase 6 .43 <br />4 Stri to soil from Phase 9, mine Phase 8, reclaim Phase 7 .21 <br />5 Stri to soil from Phase 10, mine Phase 9, reclaim Phase 8 1.92 <br />6 Stri to soil from Phase 11, mine Phase 10, reclaim Phase 9 1.09 <br />7 Stri to soil from Phase 12, mine Phase 11, reclaim Phase 10 0.99 <br />8 Strip topsoil from Phase 13, mine Phase 12, reclaim Phase 11 0.32 <br />9 ine Phase 13, reclaim Phase 12 0.04 <br />10 eclaim Phase 13 0.02 <br />Total 12.20 <br />Haldorson Sand and Gravel Mine 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.