Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 07/292003 <br />User: JD1 <br />State :Colorado Permitfjob# :M-1977-560 <br />County :Otero Abbreviation :none <br />Site :Rocky Forol East Pd Filename :M560-007 <br />Agency or organization name :DMG <br />Permit or other job action :Phased reclamation <br />Task description :Smooth grade topsoil--Stage /V <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 8,873 <br /> Utilization <br />Ownership cosUhour : $50.76 NA <br />Operating cosUhour: $61.72 100 <br />Ripper op.cosUhour: $0.00 0 <br />Operator cost/hour : $24.01 NA <br />Total unit cost/hour : $136.49 Total fleet costRiour <br />Swell <br />LCY factor : NA <br />Source of estimated volume :call <br />Source of estimated swell factor :NA <br />NOURLY PRODUCTION <br />Average push distance : 400 feet <br />Unadjusted hourly production : 188.9 LCY/hr <br />Material wnsistency description <br />Average push gradient : 0.00 <br />Average site altitude : 4,150 fey <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Toa Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.962 /LCY <br />Data source : (CRG) <br />ai36.49 <br />Loose <br />volume: 8,873 LCY <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.75 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Source <br />141.94 LCY/hr <br />141.94 LCY/hr <br /> <br /> <br />62.51 Hours <br />