My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36250
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:39 PM
Creation date
11/21/2007 2:59:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
10/2/2006
Doc Name
E-mail regarding NOV
From
DRMS
To
Twentymile Coal Company
Violation No.
CV2006006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
anticipate that all related activities would be completed by the abatement <br />date of 10/30/06 for Steps 8 and 9. Given that we cannot control when, and <br />whether or not the identified agencies will provide comment/concurrence, <br />the abatement requirements for Step 7 need to be modified to address a "no <br />comment" situation, and adequate time needs to be provided to allow for the <br />specified review and concurrence actions. <br />Step 8: Continue water quality sampling and submit copies of reports to <br />CDPHE and CDRMS - As noted for Step 6, we have voluntarily implemented a <br />rigorous water quality sampling schedule, and will copy the CDRMS on all <br />related reports submitted to the CDPHE-WQCD. <br />Step 9/10: Reestablish DBMS approved sediment controls - Under a field <br />authorization, we are proceeding with modifications within the Pond E <br />impoundment area to isolate the coal fines within the pond and reestablish <br />the design storage capacity ASAP. We anticipate submitting a revised pond <br />design to address the interim and any long-term modifications. <br />Step 11: Submit a written report on completion of the clean-up to CDRMS, <br />CDPHE-WQCD, CDOW, and USACE - Wi11 be completed and submitted on complation <br />of the work. <br />Given the reasons noted above, and that the actions under Steps 6 and 7 are <br />not critical to protection of the environment, we respectfully request that <br />the abatement dates for Steps 6 and 7 be extended to 10/30/06. I have also <br />attached a revised application form for MR06-211, addressing your stated <br />concerns - <br />Best regards, <br />Jerry <br />(See attached file: Downstream User Mail Receipts.pdf)(See attached file: <br />MR06-211 DMG App Form Rl.doc) <br />E-mail Disclaimer: <br />The information contained in this e-mail, and in any accompanying <br />documents, may constitute confidential and/or legally privileged <br />information. The information is intended only for use by the <br />designated recipient. If you are not the intended recipient (or <br />responsible for the delivery of the message to the intended <br />recipient), you are hereby notified that any dissemination, <br />distribution, copying, or other use of, or taking of any action <br />in reliance on this e-mail is strictly prohibited. If you have <br />received this email communication in error, please notify the <br />sender immediately and delete the message from your system. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.