Laserfiche WebLink
~~ <br />C. Fault <br />I. Identification <br />NOV No.: CO-98-001 Type of Violation: <br />Date Issued: January 21, 1998 Administrative <br />Mine: Roadside Portals X Performance Standard <br />Permit No.: C-81-041 X Permit Condition <br />Operator/Permittee: Powderhorn Coal Company <br />II. Mandatory Penalties Per day assessment is calculated based upon the factors <br />Cessation Order defined in Section III below. <br />X Failure to Abate - S75O to S5,OOO/day x 4 days 1 /20 - 23198 <br />Mining without a Permit <br />III. Penalty Calculation Criteria -Rule 5.04.6 <br />Source of Information or Assessment: <br />Category <br />A. History <br />2 NOVs past 12 months x $50 <br />COs past 12 months x 5250 <br />B. Seriousness <br />Severe <br />Significant <br />Low/Moderate <br />Insignificant <br />Administrative <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />Civil Penalty Worksheet <br />S1,5O0 S1,75O <br />S1,OO0 S1,25O <br />S25O 500 <br />SO <br />Operator/Permittee X Division <br />Comments <br />NOV CV-97-001 & NOV CV-97-016 <br />(S1OO) <br />Failure to completely abate the NOV <br />CV-97-016 created on going potential <br />5750 for damage to reclamation and offsite <br />transport of disturbed area drainage. <br />Intentional 51,000 S1,25O S1 500 More diligent compliance should have <br />Negligence S25O S5OO 5750 occurred. <br />Unavoidable SO <br />D. Number of Days Penalty Assessed 4 ($1350 X 4) <br />E. Good Faith (May not exceed 51,2001 <br />Credit -Extraordinary Effort None granted <br />Credit - Rapid Compliance <br />;.. <br />l~ . <br />Assessment Officer <br />Signature ,' <br />Davi Berm Date February 27, 1998 <br />Name ted M.\OSS\JHRTEMP~CNVOt0a \.DTM <br />