My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36083
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:31 PM
Creation date
11/21/2007 2:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
7/6/1993
Doc Name
SETTLEMENT AGREEMENT CESSATION ORDER NO CO-93-012 NOV NO
Violation No.
CV1993012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiniiiiiiii <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS A ND GEOLOGY ~ <br />°f <br />ao <br />Department of Natural Reso urces ,,~ <br />, <br /> ~ <br />Ne <br />1313 Sherman Si.. Room 215 • • <br />Denver, CO 80203 • ~ <br />• ~ <br />Phone: l303) 866-3567 SETTLEMENT AGREEMENT retc <br />FAX (303) 832-8106 <br />Roy Romer <br />Cessation Order No. CO-93-012 Notice of Violation N o. cnvernor <br /> Michael B. Long <br />Mine Name: Golden Eagle Permit No.: C-81-013 Drvis~on Director <br />Permittee: Basin Resources <br />Mailing Address: 14300 Highway 12 <br /> Weston, CO 81091 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Las Animas Type of Mine: Underground/Federal <br />The Division of Minerals and Geology ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on June 18, 1993, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be $3,800,00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />DATE: <br />DATE: 93 <br />OPERATOR <br />Sy <br />DIVISION OF MINERALS AND GEOLOGY <br />BY ~ ~-~ur~J <br />rence urricer <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />C.R,S. 34-33-123(8 )(c)(d) <br />By <br />8017E/scm <br />
The URL can be used to link to this page
Your browser does not support the video tag.