Laserfiche WebLink
Seed mix is to be drilled 0.5 to 1.5 centimeters into the prepazed soil at the recommended rate <br />and followed by a roll packer. Steep slopes aze to be broadcast seeded at twice the recommended <br />rate and lightly harrowed or tracked into the soil and covered by 2 tons per acre of weed-free <br />straw or hay mulch. Mulch is to be crimped into the soil with a crimper or un-canted soil disc, or <br />tackified with an appropriate emulsion tackifier. <br />(iiil Fertilizing <br />Stored topsoil is to be tested prior to respreading and appropriate amounts of phosphorus and/or <br />nitrate nitrogen is to be added during soil prepazation according to the following table. <br />Current phosphorous <br />content determined Supplemental <br />phos orous required Current nitrate <br />nitrogen content Supplemental <br />nitrogen required <br />0-3% Add 601b/acre 0-10% Add 401b/acre <br />4-7% Add 301b/acre 11-20% Add 201b /acre <br />>7% no added pho horous >20% Add 10 lb/acre <br />(ivl Alternate/Additional Reve etation <br />None <br />(vl Tonsoiling <br />Stockpiles of topsoil from previous operations and all surface soils stripped from excavation or <br />disposal azeas shall be salvaged and stockpiled outside of work and stockpile azeas in the <br />worked-out pit floor. Critical azea seeding shall be broadcast onto the stockpiles for interim <br />protective vegetative cover. Prior to reclamation topsoiling tazgeted azeas of the site, compacted <br />soils shall berip-loosened to a minimum depth of one foot. Stockpiled topsoil (having former <br />vegetation incorporated therein) shall be distributed evenly over disturbed and finish-graded <br />sideslope surfaces of the permit azea to a minimum thickness of six inches. Plant growth <br />capability shall be enhanced by the above-mentioned added fertilizer and crimping mulch into <br />the sloped surfaces ofthe permit area. <br />No surface water accumulation ponds, buildings, nor roads shall remain on the site during the <br />permitted mining operation, except for the pre-existing main access road from the county road <br />through the permit area to the Shavano Cemetary. <br />Storm water outfall controls (if used) at the west side of the site shall remain until re-vegetation <br />is adequate for pertnit termination. No waste material nor overburden stockpiles shall remain in <br />the reclaimed site. <br /> <br />16 <br />