Laserfiche WebLink
.:. .. <br />-3- <br />September 1, 1982: Scott Jones replaces Craig Sherwood as coordinator. <br />September 29, 1982: Pond was to have been completed. <br />November l2, 1982 - MLRD Inspection: Jim Herron, inspector; Scott Jones, <br />contact. <br />Inspection Report Record: "Refuse pile pond r~ias to be <br />completed by December 1, 1982." t1o enforcement action taken. <br />ovember 15, 1982 - Letter from Robert Liddle to Scott Jones: Snowinass <br />old to complete the refuse pond by December 1, 1982. <br />November 19, 1982 - Letter from Scott Jones to Bob Liddle: The letter <br />requested that completion of the pond be delayed until next spring. In <br />the meantime, a water truck could be used to dewater the pond. This was <br />the first communication from Snowmass concerning the pond since its <br />approval. <br />Uecernber 3, 1982 - MLRU Inspection: Robert Liddle, inspector; Scott <br />Jones, contact. <br />Inspection Report Record: The inspection revealed that the <br />refuse area pond was not completed. <br />December 9, 1982: Notice of Violation No. 82-69 issued. <br />/mt <br />cc: Ed Bischoff <br />