My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-09-18_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:25 PM
Creation date
11/21/2007 2:53:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Letter of Transmittal
From
Muerer & Associates Inc.
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3075 St. Vrain Lakes Improvements <br />Lake Grading Engineers opinion cost estimate for DMG permit <br />EST. EST. <br />ITEM DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL <br />EROSION CONTROL <br />1 <br />2 <br />3 <br />Silt Fence 7021 LF $1.25 $8,776 <br />Seeding and Mulching 55 AC $500.00 $27,500 <br />Construction Fence 1523 LF $3.00 $4,569 <br />EARTHWORK <br />1 <br />2 <br />3 <br />Earthwork Cut to Fill Volume 190,243 CY $1.00 $190,243 <br />Topsoil Strippings 31,160 CY $1.00 $31,160 <br />Cost for backfill 8 rading to final embankment configuration 22,100 CY $1.10 $24,310 <br />DRAINAGE IMPROVEMENTS <br />1 <br />2 <br />3 <br />60" RCP 222 LF $117.00 $25,974 <br />30" RCP 127 LF $40.00 $5,080 <br />Outlet Structure 1 EA $6,000.00 $6,000 <br />SPILLWAY #1 <br />1 <br />2 <br />3 <br />Concrete Cut-off wall 13 CY $100.00 $1,300 <br />Cost for filter fabric 19630 SF $0.35 $6,871 <br />Cost for importation and placement of <br />T pe M riprap (19630 SF X 1.75 FT / 27) 1272 CY $50.00 $63,600 <br />SPILLWAY #2 <br />1 <br />2 <br />3 <br />Concrete Cut-off wall 7 CY $100.00 $700 <br />Cost for filter fabric 8900 SF $0.35 $3,115 <br />Cost for importation and placement of <br />Type M riprap (8900 SF X 1.75 FT / 27) 577 CY $50.00 $28,850 <br />SPILLWAY #3 <br />1 <br />2 <br />3 <br />Concrete Cut-off wall 10 CY $100.00 $1,000 <br />Cost for filter fabric 7260 SF $0.35 $2,541 <br />Cost for importation and placement of <br />Type M riprap (7260 SF X 1.75 FT / 27) 470 CY $50.00 $23,500 <br />SPILLWAY #4 <br />1 <br />2 <br />3 <br />Concrete Cut-off wall 12 CY $100.00 $1,200 <br />Cost for filter fabric 16800 SF $0.35 $5,880 <br />Cost for importation and placement of <br />T pe M riprap (16800 SF X 1.75 FT / 27) 1088 CY $50.00 $54,400 <br />SPILLWAY #5 <br />1 <br />2 <br />3 <br />Concrete Cut-off wall 16 CY $100.00 $1,600 <br />Cost for filter fabric 28540 SF $0.35 $9,989 <br />Cost for importation and placement of <br />T pe M riprap (28540 SF X 1.75 FT / 27) 1850 CY $50.00 $92,500 <br />JI'ILLVV/iTJ JVDI VIM ycai,vrv <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.