My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-26_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2002-09-26_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:18 PM
Creation date
11/21/2007 2:49:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
9/26/2002
Doc Name
temp. interceptor canal crossing
From
Climax Molybdenum Company
To
dmg
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CLIMA)( MOLYBDENUM COMPANY' Henderson Operations <br />a soesm~xry or aneios oodee m~~me comaaoy 19032 Couney Rd. 3 <br />RECEIVED P M tro (303] 271 -0~07 <br />ut of State (303] 569-3221 <br />SEP 2 6 2002 Fax (970] 725-0036 <br />September 24, 2002 <br />Division of Minerals arty Geology <br />Mr. Allen Sorenson <br />Environmental Protection Specialist / <br />Colorado Division of Minerals and Geology t/ ~ ~ <br />1313 Sherman Street, Room 215 ~~ -~ I/ <br />Denver, Colorado 80203 <br />RE: Proposal for a Temporary Interceptor Canal Crossing, Henderson Mill, Permit No. <br />M-77-342 ~/ ' <br />Dear Mr. Sorenson: <br />This letter and other submittals are being provided to the Division of Minerals and <br />Geology (Division) for approval to build two temporary crossings over our freshwater <br />interceptor canal. Please find attached a letter from W.W. Wheeler summarizing their <br />review of this project and maps indicating the proposed location of the crossings. This <br />request is in addition to the request made two years ago (October 2000) for a temporary <br />logging crossing. These new crossings are necessary to support our ongoing topsoil <br />salvage program. The relocation of several topsoil stockpiles will be necessary next <br />summer to avoid inundation. Henderson plans to relocate these stockpiles to the north <br />Area 21 per our approved reclamation plan. <br />Please note that these crossings will not be sized for the probable maximum snowmelt. <br />The size culvert to accommodate these flows, near the north abutment of #1 Dam, will <br />not fit in the existing canal without a major widening of the associated access road. <br />Therefore, Henderson proposes to install temporary arch culvert crossings that could be <br />removed quickly if an extreme snowmelt run-off is anticipated. Time permitting, <br />Henderson will begin constructing the new crossings and haul roads this fall. However, <br />we do not anticipate they will be completed until next spring. Henderson is also planning <br />on developing the south Area 21 topsoil stockpile location in the near future to facilitate <br />the relocation of topsoil from the southeast corner of the tailing pond. Henderson <br />assumes the previous permission granted by the Division, for a temporary logging <br />crossing on the upper portion of the interceptor canal, would still be valid pending <br />notification to the Division of the proposed location of the crossing(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.