Laserfiche WebLink
;'00 08.12 <br />bWDERHORN <br />COAL COMPANY <br />ID~IANIERFAX3800 <br />February 28, 1996 <br />FAX• III IIIIIIIIIIIIIIII <br />Mr. Dan Mathews <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />2248 Broadway, ~fC-5 <br />Grand Junction, CO 61503 <br />RE: NOV C-95-27, File C-81-041 <br />Dear Mr. Mathews: <br />PAGE 2 <br />P.O. QOM 1430 <br />Pallmae, fiolwe0o 81528 <br />(30J1484-705 f <br />F.r(7431484-~Ie~ <br />As we discussed yesterday during your inspection, Powderhorn is <br />requesting an extension of the abatement date on the subject LZOV. <br />This section of the ditch apparently was insCalled wrong due to <br />the difficulty of installation according to design, Tt took a <br />while to evaluate whether to use the existing design or to <br />install a rip rapped ditch design. We finally decided upon the <br />existing design. We are requesting an extension until the end of <br />March for the abatement date. The contractor that we have chosen <br />estimated that he could be out there the middle of March and <br />could complete it in a little over a week. Even this schedule <br />will be dependent upon weather. <br />Thanks for your assistance. <br />Sincerely, <br />~-'Larry Resc'hke <br />Engi er <br />LMR;lmr <br />Cc: Dick Reisinger(WACC) <br />MAT22896 <br /> <br />