Mr. Michael B. Long <br />2 <br />Savage of MLRD that the operator is required to submit a technical <br />revision addressing enlarging the pond. The revision is to be submitted <br />by March 12, 1990, and the operator must complete construction of the <br />structure Within 30 days of MLRD approval. The technical revision <br />should be approved Nithin 70 days of its submittal. Mr. Savage also <br />"faxed" a copy of the MLRD letter to AFO advising the operator of the <br />technical revision requirements. <br /> <br />Therefore, AFO finds that MLRD has taken appropriate action to cause the <br />violation to be corrected. <br />Please note that MLRD's response references OSM Directive INE-27. This <br />directive Was superseded by INE-35 on March 29, 1989. <br />If you Nish to discuss the matter further, please contact me or Steve <br />Rathbun at (505) 766-1486. <br />Sincerely, <br />agen, Dir <br />Albuquerque Field Of <br /> <br />