Laserfiche WebLink
<br />4 <br />for maintenance, they have completed some maintenance on the Bttll Seep Channel in the <br />past. Based on the mapping at least 25 trees nught be disturbed if a 50 foot wide channel <br />were constntcted along the alignment of the easement in the reclamation plan. It was <br />noted that regardless of who maintains the channel, a maintenance access along the <br />channel might be desirable. <br />6. The Fulton Ditch Company has a flowage easement along the Bull Seep. This easement <br />will need to be preserved to ensure that Fulton Ditch can continue to flow water through <br />the Bull Seep. <br />7. There was some debate about whether or not the trees were dieing because of the mining <br />operation and the pit liner. John Hickman noted that the group might want to drill some <br />test holes to determine the location of the water table. John feels that the water table has <br />returned to where is was before the liner was installed. <br />8. Rick Anderson stated that as owner of the Bald Eagle Conservation Easement the County <br />is interested in the long-term viability of the cottonwood trees. Several cottonwood trees <br />have died near the First Creek/Bull Seep confluence. Mr. Anderson feels that the <br />mining/lined pits to the east have altered the area's hydrology and the groundwater flow <br />to the conservation easement has decreased. <br />9. Adams County wishes to see the Bull Seep re-aligned to the eastern edge of [he <br />conservation easement (near the haul road) for two main reasons: 1) it may restore the <br />hydrology/groundwater flow to the conservation easement; 2) it would minimize tree <br />removal and disturbance to the conservation easement. <br />10. John had [o leave the meeting before the group had a chance to walk the eastern <br />alignment. After the group walked the eastern alignment, everyone agreed that it is the <br />preferred alternative. Bryan noted that a preliminary design would need to be presented <br />to the other project team members to work out details. Specifically Denver water's <br />concern about the Bull Seep Channel being relocated too close to the Howe Haller Pit <br />and liner. <br />11. Don Kennedy (Denver Water) thought that the eastern re-alignment (near the haul road) <br />would probably not impact the liner for water storage, but that Denver Water would need <br />[o evaluate further. <br />12. The high pressure gas line that parallels the First Creek alignment is exposed where it <br />crosses the Bull Seep. <br />Minutes prepared by: <br />Matthew J. Ursetta, P.E, ICON Eng. Date <br />Mazc Pedrucci, Adams County <br />c: Attendees, (email) George McDonald (Mail) <br />All Attendees from other meetings <br />C'\W INDOW S\TEMP\926 meeting tloc <br />