Laserfiche WebLink
haul roads will be reclaimed as the pit is closed. There will be no shop, plant, or <br />other facilities located at the mine site. 'fhe equipment used to mine the gravel <br />will beprimarily afront-end loader and trucks. At some point during the <br />operation a bulldozer and a scraper mny be employed. No processing of <br />material is planned at the site. All of the cyuipmcnt will be serviced off <br />premises. <br />f) Area 1, previously permitted as a 110 permit (M-19980-071), is currently being <br />mined. There arc no other existing disturbances to describe at the site. <br />g) No water is anticipated in conjunction with the operation. There could be <br />instances when heavy rainfall makes the site too wet to continue. At those <br />times, mining will simply cease until the site becomes dry enough to mine <br />again. <br />h) Mining will not go into the groundwater at the site. <br />i) Since no water is to be used, there should be no injury to existing water rights. <br />j) No refuse, acid, or toxic producing materials arc anticipated at the site. Aron 1 <br />has shown no refuse, acid. or toxic producing materials. <br />k) The fmishcd pit areas will be re-seeded to be used primarily for wildlife habitat. <br />There should be no disturbance to the hydrologic balance. <br />I) There could be some processing of the material on-site. This is dependent upon <br />the gradation of the materials es they are mined. <br />m) The commodities to be mined nre gravel, clay, and sand. <br />n) The mined materials will be sold for construction or road building material. <br />o) No explosives will be used in this operation. <br />