My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-02-24_REVISION - M1977153 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977153
>
2004-02-24_REVISION - M1977153 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:31 PM
Creation date
11/21/2007 2:46:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977153
IBM Index Class Name
Revision
Doc Date
2/24/2004
Doc Name
Construct Slurry Wall
From
Denver Water
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
also recognize the delays, expense, and difficulties involved <br />in proving in a legal proceeding the actual loss suffered by <br />OWNER if the Work is not completed on time. Accordingly, <br />instead of requiring any such proof, OWNER and CONTRACTOR agree <br />that as liquidated damages for delay (but not as a penalty) <br />CONTRACTOR shall pay OWNER $500.00 for each day that expires <br />after the Substantial Completion date. <br />ARTICLE 5. CONTRACT PRICE <br />5.1 OWNER shall pay CONTRACTOR for completion of the Work in <br />- accordance with the Contract Documents, ARTICLE 14 of the <br />General Conditions in current funds in accordance with the <br />Schedule of Values. <br />ARTICLE 6. PAYMENT PROCEDURES <br />CONTRACTOR shall submit Applications for Payment in accordance with ARTICLE <br />14 of the General Conditions, or as modified in the Supplementary <br />Conditions. Applications for Payment will be processed by ENGINEER as <br />provided in the General Conditions. <br />6.1 Progress Payments. OWNER shall make progress payments on <br />account of the Contract Price on the basis of CONTRACTOR~s <br />Applications for Payment as recommended by ENGINEER, on or <br />about the 20th day of each month during construction as <br />provided below. All progress payments will be on the basis of <br />the progress of the Work measured by the Schedule of Values <br />established in Paragraph 2.9 of the General Conditions (and in <br />' the case of Unit Price Work, based on the number of units <br />completed). <br />6.1.1 OWNER shall retain from progress payments, until payment <br />is due under the terms and conditions governing final payments, <br />amounts required by law (C.R.S. 38-26-107, as amended) and as <br />follows: <br />Ten percent of authorized payments until the Work is 50 <br />percent complete. <br />After the Work is <br />retainage shall be wi <br />payment unless, in <br />satisfactory progress <br />10 percent may be <br />payments. <br />50 percent complete, no further <br />=hheld from each subsequent progress <br />the opinion of the ENGINEER, <br />is not being made. In such case, <br />withheld from further progress <br />When the Work is essentially complete (ready for <br />operational or beneficial occupancy), the retained amount <br />may be further reduced below 5 percent to an amount <br />necessary to assure completion of the Work. <br />(BOARD OF WATER COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II) <br />(AND BRINKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ) AF-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.