SCHEDULE OF VALUES <br />CONSTRUCT SLURRY WALL AROUND HAZELTINE, ROAD RUNNER REST II <br />AND BRINKMANN-WOODWARD GRAVEL RESERVOIRS <br />FURNISH AND INSTALL CONTRACT <br />(Continued) <br />Item Work & Material Quantity Unit Price Total Amount <br />10. For furnishing materials and <br />labor for erosion and sediment <br />control Lump Sum $ <br />11. Removal of obstructions 50 Hours $ $ <br />Per Hour <br />12. For site reclamation 20 Acres $ $ <br />including seeding Per Acre <br />13.MObilization and Demobilization <br />(not to exceed 7% of Total <br />Bid) Lump Sum $ <br />TOTAL BID $ <br />ALTERNATIVE 1: <br />For additional work as defined in Alternative i that may be required as <br />determined by the ENGINEER. Work included in Alternative 2 shall be <br />considered concurrent with other work specified in the Contract. <br />lA. Furnish and install slurry <br />Soil-Bentonite cutoff wall <br />from top of cutoff wall to <br />5 feet into bedrock 45,500 SF $ <br />rci or <br />2A. Furnish and install 12" <br />drainage pipe including <br />manholes complete in place Lump Sum <br />3A. For construction of working <br />platforms and restoration <br />of area Lump Sum <br /> <br /> <br /> <br />Note: The quantities listed above are estimates only. Actual quantities <br />may vary. The CONTRACTOR shall be paid only for actual approved <br />quantities completed. <br />(BOARD OF WATER COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II) <br />(AND BRINKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ADDENDUM NO. 3 ) BF-3 <br />