Laserfiche WebLink
BOARD OF WATER COMMISSIONERS <br />DENVER, COLORADO <br />ADDENDUM N0.3 <br />TO THE CONTRACT DOCUMENTS <br />CONSTRUCT SLURRY WALL AROUND <br />HAZELTINE. ROAD RUNNER REST II AND <br />BRINKMANN- WOODWARD GRAVEL RESERVOIRS <br />SP 06700A <br />July 24, 2003 <br />TO ALL PLANHOLDERS: <br />This Addendum No. 3 consists of Page AD3-1. The following changes, additions and/or <br />deletions aze hereby made part of the Contract Documents to Construct Slurry Wall Around <br />Hazeltine, Road Runner Rest II and Brinkmann-Woodward Gravel Reservoirs, dated June 2003, <br />as fully and completely as if the same were fully set forth therein: <br />SPECIFICATIONS: <br />BID FORM, SCHEDULE OF VALUES, Pages BF-2 and BF-3: <br />DELETE: Pages BF-2 and BF-3 (issued under Addendum No. 2) in their <br />entirety. <br />SUBSTITUTE: Attached pages BF-2 and BF-3. <br />2. SECTION 02225 -ABANDONING OBSERVATION WELLS: <br />ADD: Attached SECTION 02225 -ABANDONING OBSERVATION <br />WELLS and Supplement. <br />Al] Bidders shall acknowledge receipt and acceptance of this Addendum No. 3 in the space <br />provided on the Bid Form. Bids submitted without this acknowledgement will be considered <br />informal. <br />Very truly yours, <br />James H. Weldon <br />Engineering Manager <br />Denver Board of Water Commissioners <br />(BOARD OF WATEA COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II ) <br />(AND BRINKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ) AD3-] <br />