Laserfiche WebLink
SCHEDULE OF VALUES <br />CONSTRUCT SLURRY WALL AROUND HAZELTINE, ROAD RUNNER REST II <br />AND BRINKMANN-WOODWARD GRAVEL RESERVOIRS <br />FURNISH AND INSTALL CONTRACT <br />(Continued) <br />Item Work & Material Quantity Unit Price Total Amount <br />10. For furnishing materials and <br />labor for erosion and sediment <br />control Lump Sum $ <br />ll. Removal of obstructions 50 Hours $ $ <br />Per Hour <br />12. For site reclamation <br />including seeding <br />20 Acres $ <br />Per Acre <br />13. Mobilization and Demobilization <br />(not to exceed 7~ of Total <br />Bid) Lump Sum <br />TOTAL BID <br />ALTERNATIVE 1: <br /> <br /> <br />S <br />For additional work as defined in Alternative I that may be required as <br />determined by the ENGINEER. Work included in Alternative I shall be <br />considered concurrent with other work specified in the Contract. <br />lA. Furnish and install slurry <br />Soil-Bentonite cutoff wall <br />from top of cutoff wall to <br />5 feet into bedrock <br />2A. Furnish and install 12" <br />drainage pipe including <br />manholes complete in place <br />3A. For construction of working <br />platforms and restoration <br />of area <br />45,500 SF $ <br />Per SF <br />Lump Sum <br />Lump Sum <br /> <br />S <br />5 <br />Note: The quantities listed above are estimates only. Actual quantities <br />may vary. The CONTRACTOR shall be paid only for actual approved <br />quantities completed. <br />(BOARD OF WATER COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II) <br />(AND BRINKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ADDENDUM NO. 2 ) BF-3 <br />