My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-05_REVISION - M1984099
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984099
>
1998-10-05_REVISION - M1984099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:46 PM
Creation date
11/21/2007 2:45:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Revision
Doc Date
10/5/1998
Doc Name
HALL IRWIN TR BAILEY PIT M-84-099
From
HALL IRWIN CO
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� III IIIIIIIIIIIIIIII <br /> P.O.BOX 519 OFFICE:30264TH AVE. OFFICE PHONE:(970)352.6057 999 <br /> GREEIPY,CO 80632 GREELEY,CO 80631 METRO LINE:(303)654-1684 <br /> FAX:(970)352-62U <br /> RECEIVED <br /> September 23, 1998 <br /> 31 <br /> Ms. Christina Kamnikar <br /> Environmental Reclamation Specialist DIBV. �GEOLOGYLs <br /> Division of Minerals and Geology <br /> 1313 Sherman, St. Room 215 <br /> Denver, CO 80213 <br /> Dear Ms . Kamnikar; <br /> RE: Hall-Irwin - Technical Revision <br /> Bailey Pit, M-84-099 <br /> This Technical Revision is to address the Division concerns <br /> and discussion points that resulted from the September 4 meeting <br /> between Steve O'Brian of Environment, Inc. , yourself and Mr. Carl <br /> Mount. This Technical Revision addresses the five points out- <br /> lined by Mr. Mount. <br /> 1 ) ARMY CORPS OF ENGINEERS(ALOE) - Attached is a copy of Tectonic <br /> Construction CO's ACOE permit for your review. This permit <br /> required them to take specific actions to stabilize the <br /> river banks of the St. Vrain River where it crosses from <br /> west to east in the central part of the site. It included <br /> bank sloping and reclaiming the area with willow and cotton- <br /> wood stakes and wetland grasses to reduce or slow erosion <br /> along the channel. The filling and bank reconstruction work <br /> was completed by the spring of 1996. The upstream gravel <br /> operation (Siegrist) moved the river back into its original <br /> channel in 1996/97 and the highwater that occurred during <br /> the spring of 1997 and 1998 caused changes in the river. It , <br /> caused a bank cutting problem in the southwest quadrant of <br /> the river area that also caused additional channel changes <br /> downstream along the project area that now have to be cor- <br /> rected. The ACOE will not release the Tectonic Construction <br /> CO. from the permit until these corrections are done. <br /> Attached is a letter from Environment, Inc. , containing the <br /> technical information regarding the bank regrading. The <br /> Mining <br /> Locations Greeley Windsor Brighton Longmont <br />
The URL can be used to link to this page
Your browser does not support the video tag.