My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35683
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:14 PM
Creation date
11/21/2007 2:45:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
3/17/1996
Doc Name
PHONE CALL LOG FOR VIOLATION REPORTING
Violation No.
CV1996006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'yY <br />~~~ ~~~~~~~~~~~~~~~~ RFr.1=ivEp ' <br />999 ... _ _ , <br />Division of Minerals ~ <br />Phone Call Log for Violation Reporting <br />Water Quality Control Division <br />Permits and Enforcement Section <br />Entity: Colowyo Coal Co., L.P. <br />Permit No.: COG-850017 Person Reporting: Kimberley WDIf <br />County: Moffatt Phone No.: (970)824-1531 <br />Parameter: Total Suspended Solids and Reported Value: 21,400 mg/Q (TSS) <br />Total Iron @ Outfall 010 _~tJ~' IQa{~ y 258 mg/Q (TFe) <br />Date of Violation: 18 Mar. 96 Permit Limit: 35/70 mg/P (avg./max.) <br /> 3.0/6.0 mg/P (avg.lmax.) <br />Date & Time of Report: 25 March 96, 3:10 pm Has this happened before: <br />Probable Cause: Please also see 22 March Phone Log. Pond discharged through primary <br />riser and head gate on March 5 & 6 but not sampled. Head gate opened just long enough <br />to sample on March 18. <br />Written Report to Follow: Yes <br />Comment: DMG reports West Pit mine water was being pumped to pond and is not <br />included in pond design calculations, nor is discharge through the head gate. Settleable <br />solids were non-detectable and Colowyo intends to request a storm exemption although <br />not sampled during stormwater discharge and they discharged through the head gate, in <br />addition to the primary riser pipe. <br />... .rr <br />Recorded By: Kathleen Sullivan <br />Date: March 26, 1996 <br />cc- District Engineer, Field Support Section, WOCD <br />Bob Shukle, Permits and Enforcement Section, WOCD <br />Erica Crosby, DMG <br />Original to MS-3 File <br />
The URL can be used to link to this page
Your browser does not support the video tag.