Laserfiche WebLink
<br /> . <br />h` 9.v ~- <br />,_ -.4 <br />. / _ <br /> r +t .` <br />. . <br />Backfilling and Grading: The #1 mine portal aeeds~to fiave~a-~ <br />permanent drainage system installed and the portal area needs <br />to be backfilled. Since the discharge will be continuous it' <br />serves no~purpose to postpone the installation of the - <br />permanent drainage system. <br />Enforcement Actions: No enforcement actions. were taken by DMG <br />as a resulE of this inspection, however a TDN will be issued <br />to address the ponds which were discussed above. <br />MSEIR: Those .items in block 24 marked with a "2" have been <br />discussed above. Those marked with a "3" were not applicable <br />to purposes of this inspection. <br /> <br /> <br />4 a._ <br />1 <br />.~: <br />8 <br />