My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-19_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2007-03-19_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:31 PM
Creation date
11/21/2007 2:43:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
Revision
Doc Date
3/19/2007
Doc Name
Reclamation Cost Estimate
From
DRMS
To
File
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 03/16/2007 <br />User: ESC <br />State :Colorado <br />County :Grand <br />Site :Thompson Properties <br />Agency or organization name : DRMS <br />Permit or other job action :AM-02 <br />Task description :Reduce <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />to 2h:1 v slope <br />Basic machine :Cat D8R Sedes ll - SSU (200; <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank dpper <br /> Utilization <br />OwnershipcosUhour : $58.86 NA <br />Operating cosUhour : $73.75 100 <br />Ripper op.cosUhour : $8.51 100 <br />Operator cost/hour : $32.78 NA <br />Total unitcost/hour : $173.89 TotalfleetcosUhour <br />volume : 12,444 BCY <br />3347.79 <br />Swell Loose <br />factor: 1.430 volume: 17,795 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />t s~.a _~~ ,. ..,_,~. , ,.,,,_._, .~ e s<.,_.~ s _ -_ ~i <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Hard to cut or frozen <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 8,000 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost: $1.663 /LCY <br />PermiUjob# :M-1983-102 <br />Abbreviation :none <br />Filename :M102-001 <br />Operator skill : 0.75 <br />Material consistency : 0.70 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.21 <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Total job time <br />Total job cost <br />Data source : (CRG) <br />104.54 LCY/hr <br />209.07 LCY/hr <br />85.11 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.