Laserfiche WebLink
'.l.::f' .: ~:: .: v <br />ROADABLE EQUIPMENT sheet 2 of L <br />Machine Total Fleet Size Haul Trip Retum Trip <br />Description CosUhour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Fuel Tanker, 4x2, 170 HP $64.11 1 $64.11 $64.11 <br />-Cube Truck, 4x2, 170 HP $72.01 1 $72.01 $72.01 <br />-Light Duty Pickup, 4x4, 3/4 T $46.30 1 $46.30 $46.30 <br />Subtotals : 518242 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.14 0.14 Total non-roadable mob/demob cost' <br />0.14 0.14 ' Mro round Yips with haul dg <br />1.00 NA Total roadable mob/demob cost " <br />1.00 NA `• one round tdp, no haul rig <br />2.29 <br />Granby <br />5.0 miles <br />35.0 mph <br />$6,771.84 <br />$52.12 <br />JOB TIME AND COST Total job time : 4.57 hours <br />Total job cost : 56.824 <br />