My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-03-14_REVISION - M2000016 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-03-14_REVISION - M2000016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:24 PM
Creation date
11/21/2007 2:43:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
3/14/2005
Doc Name
Industrial Activities & Stormwater Management Controls
From
Lafarge West Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br />Comprehensive Inspections <br />Comprehensive inspections performed by qualified individuals, record keeping and internal <br />reporting are essential activities under the SWMP and are outlined below. All records and <br />reports are to be maintained with the plan at the managing office. <br />Qualified personnel shall make a comprehensive inspection of the stormwater management <br />system at least twice per yeaz in the spring and fall for all active facilities. For idle sites where <br />an employee is not stationed or does not routinely visit the site, inspections shall be conducted <br />every two years. For inactive sites, inspections shall be conducted every three yeazs. These <br />comprehensive inspections must be documented and summarized in the Annual Report. <br />Material handling areas, disturbed areas, areas used for material storage that aze exposed to <br />precipitation, and other potential sources of pollution identified in the SWMP in accordance with <br />the permit shall be inspected for evidence of, or the potential for, pollutants entering the drainage <br />system. Structural stormwater management measures, sediment and control measures, and other <br />structural pollution prevention measures identified in the plan shall be observed to ensure that <br />they aze operating correctly. A visual inspection of equipment needed to implement the plan, <br />such as spill response equipment, shall be made. <br />Based on the results of the inspection, the description of potential pollutant sources and pollution <br />prevention measures identified in the plan shall be revised as appropriate. Such revisions shall <br />provide for implementation of any changes to the plan in a timely manner, but in no case more <br />than 90 days after the inspection. <br />A report summarizing the scope of the inspection, personnel making the inspection, the date(s) of <br />the inspection, major observations relating to the implementation of the SWMP, and actions <br />taken as described above shall be made and retained as part of the SWMP for at least three yeazs. <br />The report shall be signed by a Lafarge employee authorized to certify the plan. <br />Riverbend <br />Storm Water Management Plan <br />Page 17 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.