My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-03-14_REVISION - M2000016 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-03-14_REVISION - M2000016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:24 PM
Creation date
11/21/2007 2:43:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
3/14/2005
Doc Name
Industrial Activities & Stormwater Management Controls
From
Lafarge West Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preventative Maintenance <br />Daily inspections of all storage and activity areas are conducted as a part of the operation. <br />Comprehensive inspections aze completed as required based on activity at the site (please see <br />Section 4 for additional details). Inspections include at a minimum the following: <br />• Integrity of diesel storage tank and secondary containment <br />• Integrity of perimeter berms and truck wash out berms <br />• Fuel spills in diesel fueling area, and material spills in the silo area and mixer azea. <br />• Open aggregate storage bins <br />• Air and oil leaks on machinery and equipment <br />• Belts, pulleys, rollers, and gates on plant equipment <br />Cleaning and maintenance is performed as needed and in response to inspection results. Records <br />of these inspections are available through the plant manager or another member of the site <br />SWMP Administration Team. <br />Management Device Inspection Frequency Cleaning <br />Frequency Potential Failures to <br />Observe Closely <br />Hydrocarbon tanks Monthly As needed Adequate containment <br />Hydrocarbon secondary <br />containment Monthly As needed Adequate containment <br />Catch basins Bi-annual As needed Insufficient capacity <br />Settling ponds Bi-annual As needed Insufficient capacity <br />Additive Storage Monthly As needed Adequate containment <br />Containment devices (berms, <br />ditches, etc.) Quarterly As needed Adequate containment <br />General Plant Conditions Daily As needed <br />Perimeter Erosion Quarterly As needed <br />Other <br /> <br />Storm Water Management Plan <br />Page 12 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.