Laserfiche WebLink
2 Mine North Area while processing gold mine tailings. Set- <br />tle and stockpile fines from processing 144.0 <br />3 Mine north area after gold plant is shut down. Settle and <br />stockpile fines from processing 36.0 <br />4 Remove portable facilities in north azea and camp azea. 0.5 <br />5 Regrade 23.1 acres of north area. Remove all ditches and <br />sediment sumps on the west edge of the north azea. 2.0 <br />6 Place topsoil or substitute fines on 23.1 acres of regraded <br />area. (9317 cy) 2.5 <br />7 Reseed wetland fringe azeas and all dryland azeas. 1.5 <br />8 Place tree saplings on all azeas designated. 1.5 <br /> <br /> TOTAL MONTHS (INCLUDING MINING) 191.0 <br />4. Revegetation <br />All reclaimed areas except roads and water surfaces will be reseeded after applying the 2.5" to 3" <br />of topsoil or substitute fines. Three distinct revegetation methods will be employed: <br />1) Wetland fringes along ponds and lakes of approximately 20 feet width. This revegetation ef- <br />fort will occur on approximately 3.08 acres on both the gravel and gold azeas, which will involve <br />broadcast seeding according to the following plan: <br />Wetlands Seed Mix <br />Common Scientific- Rate-PLS Native or Warm/ Seeds Cost <br />Name-Vari- Name LBS-Acre Introduced Cool Per SQ. PLS/ <br />ety Season FT Acre <br />Alma Placer 7/03 43 <br />