Laserfiche WebLink
%A~~/ <br />~.~ ~S'~ STATE OF COLORADO <br />4 <br />OFFICE OF THE STATE ENGINEER qL/~ Q <br />DMabn of Water Resources <br />~1 S <br />n <br />/ <br />/ <br />( <br />/It <br />/!1~ <br />Department or Natural Raaources <br /> <br />t <br />1373 SAemwn Stratl, Room B18 ~. <br />Oemer, Colorado 80203 <br />Pironr. (303) 8863581 <br />FAX (303) 880.7589 <br />Mtp:/ANww.Watn.6hh.eo.ue ~ Gorsrnat Jf. <br />Response to Reclamation Pennit Application Consideration Hm <br />Sn <br />D <br /> e <br />. <br />ermen <br />~ Fxeatlvs n6er%er <br /> (Veurrd <br />DATE: July 24, 2007 sm°ena"Bar <br />TO: Thomas A Schreiner, Environments) Protection Specialist <br />CC: Division 2 Office; District 11 Water Commissioner <br />FROM: Clay Kimmi, P.E. ~// RECEJVED <br />RE: Half Moon Pit, File No. M-77-071 ~VL' <br />Operator. Lake County, 2,4 i'001 <br />Contact: Kenneth Olsen, County Administrator, (7I9~Sti-0093 ~j Oiv+s+on w neaamaNon <br />Section 7, Twp 10 South, Rng 80 West, 6th P.M., Lake County Mining and Safety <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within Ii00 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Sce comments below. <br />COMMENTS: If stormwater runoff is intercepted by this operation or after reclamation, and it is not <br />diverted or captured (n priority, it must be released to the stream system within three days. This may require <br />a discharge permit from CDPHE-WQCD. Otherwise the operator will need to make replacements for <br />evaporation. <br />The applicant indicated the operation would use water for asphalt batch plant operations from Parkville <br />Water District. The applicant will need to ensure that the operation obtains this water from a properly <br />decreed source for such indusVial uses. <br />Tha applicant may contact the State Engineer's Office with any questions. <br />