My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-11_ENFORCEMENT - C1981014
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981014
>
2005-01-11_ENFORCEMENT - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2020 4:27:01 PM
Creation date
11/21/2007 2:39:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
1/11/2005
Doc Name
Paid Penalty
From
Energy Fuels Coal Inc.
To
DMG
Violation No.
CV2004003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f' ~~~ c <br />':~: COLORADO DIVISION OF MINERALS AND GEOLOGYT~~~® <br />1313 Sherman Street, Room 215, Denver, Colorado 80203. (303) 866-356,2 C ~ ,~ <br />JAN ~ U 2005 <br />SETTLEMENT AGREEMENT <br />NOV/COND.: CV-2004-003 piuisionotMinetalsandGeologY <br />MINE: Southfield Mine DATE ISSUED: September 13, 2004 <br />PERMIT NO.: C-1981-O14 TYPE OF MINE: Underground/Non-Federal <br />OPERATOR/PERMITTEE: COUNTY: Fremont <br />Energy Fuels Coal. Inc. <br />ATTENTION: George Patterson <br />ADDRESS: P.O. Box 459 <br />Florence, CO 81226 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on November 30, 2004, the Division and the operator <br />hereby agree as follows: <br />The amount of the penalty shall be $500.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />_.-fixed-penalty_.,3mount will likely be the original nalty assessment, based on the factors referred to in C.R.S. ]973, <br />34-33-123(8xa). - -- <br />OPERATOR: ~~~ ~ ~~l~ii.c~DATE; ~~ -~G '~T <br />gy ~~ . <br />DIVISION OF MINERALS AND GEOLOGY: ~ ~ p~ <br />By 6 ~~ <br />ere ce Officer <br />Division Director <br />DATE: /'~ Z o0 <br />Penalp~ Adjustmrnt Reviewed <br />1 Rule 5.04.3(4){c)) <br />CRS 34-33-123(SNc) and (d) <br />f.NV+HA CWXIIIN AAG !IXNIIIII IWJSI AN <br />
The URL can be used to link to this page
Your browser does not support the video tag.