My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:49:18 AM
Creation date
11/21/2007 2:38:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
GENERAL OPERATION INFORMATION
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Dewatering of the tailings will occur through two <br />• methods, underdrainage into a drain layer over the liner and <br />through the main embankment to a lined collection pond, and <br />evaporation and water reclaim from the free water pool on top <br />of the tailings for reuse in the mill. Water within the <br />drainage layer will be directed to a lined collection ditch <br />at the downstream toe of the embankment. The ditch will route <br />flows to a collection pond located downgradient of the main <br />embankment. Because of the potential for continuous high <br />hydraulic heads, the pond will be double-lined with a leak <br />detection layer between the liners. From the double-lined <br />storage pond, water will be recycled to the free water pool <br />in the tailings disposal area using an automatic pump and <br />pipeline system. The designs for the drainage layer are <br />discussed in detail in Section D.6.5.2. The collection pond <br />is discussed in detail in Section D.6.5.4. <br />Two diversion systems around the southern and eastern <br />• end of the disposal area have been designed to safely conduct <br />the calculated flows from the 100-yr recurrence interval, 24- <br />hr duration storm event. The runoff from the undiverted <br />catchment area, and precipitation falling directly on the <br />disposal area from the design storm event are accommodated in <br />normal operation. The diversion design is discussed in Section <br />D.6.5.5. The project water balance is contained in Section <br />D.6.7. <br />Two additional embankments will be constructed along the <br />perimeter of the disposal area. The first embankment will be <br />constructed as part of Phase I. The embankment, designated as <br />the East Dike, will be constructed on the upper end of the <br />disposal area on the east side to contain tailings and to <br />divert storm flow from Catchment Area D. The second embankment, <br />designated as the North Dike, will be constructed during Phase <br />" :-~ <br />0-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.