My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:49:18 AM
Creation date
11/21/2007 2:38:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
GENERAL OPERATION INFORMATION
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The mill will be a closed circuit with backup systems to ensure that <br />• no cyanide solutions will escape the mill. Mill facilities design <br />specifications will be submitted to the Division upon completion. <br />Cyanide will be stored in a secured area. The area will include a <br />concrete base with curbs to ensure containment in the event of a <br />spill. Cyanide will be shipped to the site in Flo-Bins. Flo-Bins are <br />specially designed, heavy metal containers used by DuPont for <br />shipment of sodium cyanide. Flo-Bins are accepted by the Department <br />of Transportation as a safe shipping container for cyanide. The Flo- <br />Bins are returnable and will not be disposed on site. Each Flo-Bin <br />i s numbered and the numbers are tracked by DuPont to ensure that each <br />container is returned. <br />D.6 Tailings Disposal <br />D.6.1 General Desion Concepts <br />The tailings from the mill circuit will be disposed in <br />a slurry form from the processing and treatment. facilities. <br />• The slurry will be delivered to the tailings disposal area by <br />pipeline using gravity and pumped delivery. The disposal system <br />has been designed as a closed circuit, zero discharge facility. <br />The solid and liquid portions of the tailings will remain <br />contained within the facility. The proposed management of the <br />facility will alleviate the potential of a detrimental impact <br />to the surface water and groundwater of the project area and <br />vicinity. The facility is capable of containing up to and <br />including the probable maximum precipitation event during <br />operations. The disposal area will be constructed with a liner <br />system which has been chosen to provide containment and <br />collection of the tailings water. <br />The tailings will be deposited by spigotting around the <br />perimeter of the disposal area. The proposed method of <br />tailings deposition is the managed thin layer deposition <br />technique. This technique promotes deposition of thin layers <br />• <br />D-ls <br />
The URL can be used to link to this page
Your browser does not support the video tag.