Laserfiche WebLink
Golden Eagle Permit Renewal File -3- April 27, 1994 <br />Comment Document Resolution.. <br />11. Some of Basin's maps have a 2/25/94 Addressed. The Division <br />surveying error that needs letter agrees. Revised Mine <br />correcting. Progress Map was submitted <br /> 4/8/94. <br />12. Basin should disclose extraction 2/25/94 Addressed. The Division <br />thickness beyond that currently letter agrees. The Division believes <br />anticipated, for the purpose of this should be stipulated as a <br />confirming subsidence requirement of the permit. <br />calculations. <br />13. An agreement between Basin, 4/5/94 Addressed. The Division <br />Raton West and Las Animas letter disagrees. The Division <br />regarding map updates, believes that agreements <br />information dissemination reached between landowners, <br />between the three parties, counties and operators are not <br />reinforcement of residential within the jurisdiction of the <br />structures, a trust account for State to enforce, and should <br />these improvements, protection not be included in the permit <br />of wells, purchases of lots by document. <br />Basin, and a subsidence bond <br />should be made part of the <br />permit. <br />DIH/bjw <br />m:\oss\bjw\dih <br />