Laserfiche WebLink
.:- _ ~.., <br />Justification of Settlement Agreement <br />for NOV C-g1-005 <br />Conference Summary <br />NOV C-91-005 was issued for "failure to conduct mulching and seeding <br />operations of topsoiled areas during the first normal period for favorable <br />planting" as required in Rule 4.15.3(1). <br />The NOV was discussed briefly, in general term <br />representing American Shield indicatetl that he <br />either the facts of the violation as described <br />report or the amount of proposed civil penalty <br />Division offered no further information on the <br />the components upon which the proposed penalty <br />The proposed civil penalty was: <br />History 350. 00 <br />Seriousness 3250. 00 <br />Fault 3500. 00 <br />Good Faith 3 0. 00 <br />rotas 3aoo.oo <br />s, at which point Greg Lewicki, <br />had chosen not to contest <br />in the NOV and inspection <br />David Berry, representing the <br />specifics of the violation or <br />assessment was issued. <br />Since the originally proposed penalty was contested by neither party, the <br />$800.00 amount is proposed in the Settlement Agreement. <br />8126E <br />